Date (GMT) Event Cons. Actual Previous Nov 28 00:30 Construction Work Done 2.700 % 1.700 % 0.900 % Read the Construction data at ABS News Australia 3Q Construction Work Done rises to 1.7% vs 0.9% (FXstreet.com) Wed, Nov 28 2012, 00:30 GMT
Here is the original:
AU: Construction Work Done: 1.700 %